Search

Potain Tower Cranes at Work on Bridge in Turkey

Two Potain tower cranes are building a 610-m-long cable-stayed bridge in southeast Turkey.The two MC 235 Bs are working ten hours a day at the 30-month project, which will create a vital connection across the Ataturk Dam Reservoir on the Euphrates River. The 10 T capacity MC 235 Bs were supplied to main contactor Gulsan Co by Potainvs Turkish dealer Tekno Vint, which is the largest tower crane operator in Turkey. Sinan Tnreyen, Group Director at Tekno Vint, says the Potain cranes are ideal f